From Sale to Pickup: A Smooth Handoff Between Sales and Yard
How stone distributors avoid pickup mistakes: confirming slab IDs, payment, staging, paperwork, loading inspections and communication with the fabricator.

The short answer
A smooth sale-to-pickup handoff confirms the exact slab IDs, payment status and pickup time, stages the slabs before the truck arrives, prepares paperwork that lists each slab, inspects and photographs slabs during loading and confirms completion with the fabricator. Most pickup errors come from missing information between sales and the yard.
Key takeaways
- Sales and the yard must share the same slab IDs.
- Stage slabs before the truck arrives.
- Inspect and photograph slabs during loading.
- Update inventory immediately after pickup.
Why handoffs fail
The salesperson knows which slabs were sold; the yard team needs to find and load them. If the handoff relies on a quick phone call or a note with a material name, the wrong slab can leave the yard or a fabricator's truck can wait while someone searches.

The handoff checklist
- Sale recorded with exact slab or bundle IDs.
- Payment or credit approval confirmed.
- Pickup date and time agreed with the fabricator.
- Yard notified with slab IDs and rack locations.
- Slabs staged and checked before arrival.
- Paperwork listing every slab ready.
- Slabs inspected and photographed during loading.
- Inventory updated as soon as the truck leaves.
Staging
Staging slabs in a pickup area or on accessible racks shortens loading time and reduces the risk of grabbing the wrong piece. Verify IDs on the slabs against the paperwork.
Loading inspection
Inspect edges and faces with the driver present and photograph the slabs on the truck. This protects both sides if damage is reported later.
Communicate with the fabricator
Send a confirmation when slabs are ready and when they have been picked up. If anything changes, such as a damaged slab, tell them before their truck arrives.
Common mistakes
| Mistake | Prevention |
|---|---|
| Wrong slab loaded | Match IDs, use QR scans |
| Truck waits | Stage slabs in advance |
| Damage dispute | Photos at loading |
| Inventory shows sold slab | Update at pickup |
See also slab pickup process for the warehouse side.
Communication templates
- "Your slabs CAL-2311-14 and -15 are staged and ready for pickup Thursday 8 to 10 a.m."
- "Pickup complete: two slabs loaded, photos attached."
Short, specific messages reduce calls and confusion.
Measuring handoff quality
Track wrong-slab incidents, pickup wait times and pickups delayed by missing information. Each incident points to a step in the handoff that needs attention.
Handling partial pickups
Sometimes a fabricator picks up only part of an order. Record exactly which slabs left and which remain reserved, and confirm the plan for the rest. Partial pickups are a common source of confusion when they are not recorded slab by slab.
Handoffs in iBlocky
In iBlocky, sales and the yard work from the same records. The sale is recorded on the exact slabs, QR codes help the yard locate and verify them, and status updates for everyone, in real time on Elite.
Frequently asked questions
How do I prevent the wrong slab from being picked up?
Record sales with slab IDs, stage slabs in advance and verify IDs, ideally with QR scans, during loading.
Should slabs be photographed during loading?
Yes. Photos protect both the seller and the buyer if damage is reported later.
When should inventory be updated after a pickup?
Immediately, so sold slabs do not appear available to other buyers.